Yavatmal (Borkhedi Wadner)

A four-lane road on NH-44 with project length of 138.15 kms.

The asset starts from south of Nagpur at Borkhedi (km 36+600), traversing through the districts of Nagpur, Wardha and Yavatmal in the state of Maharashtra and ends near Maharashtra/Telangana Border (km 175+000). The asset has two toll plazas at Darodha (km 92.500) and Kelapur (km 150.450). The toll plaza at Kelpaur is proposed to be shifted to km 156.650. The asset is in vicinity of Nagpur, which is home to several manufacturing hubs, food processing units and CONCOR’s multi modal logistics logistic hub. Yavatmal (textile/cotton), Butibori (MIDC), and Chandrapur (coal) are some of key traffic generators for the Asset.

Project Manager/Coordinator

Sh. Amrish M. Mankar

Nagpur (Borkhedi Wadner)

A four-lane road on NH-44 with project length of 138.15 kms.

The asset starts from south of Nagpur at Borkhedi (km 36+600), traversing through the districts of Nagpur, Wardha and Yavatmal in the state of Maharashtra and ends near Maharashtra/Telangana Border (km 175+000). The asset has two toll plazas at Darodha (km 92.500) and Kelapur (km 150.450). The toll plaza at Kelpaur is proposed to be shifted to km 156.650. The asset is in vicinity of Nagpur, which is home to several manufacturing hubs, food processing units and CONCOR’s multi modal logistics logistic hub. Yavatmal (textile/cotton), Butibori (MIDC), and Chandrapur (coal) are some of key traffic generators for the Asset.

Project Manager/Coordinator

Sh. C.M. Sinha